How Long Does It Take To Install The Outdoor Living Pod?

A typical residential installation of our Outdoor Living Pod (OLP) takes just two days. Where there are extensive preparatory works (ie groundworks) or multiple modules (see above photo) fully loaded complete with all options (screens, lighting, heating) this may add an extra day to the install period.

Installations are carried out by our own highly trained, uniformed, specialist 3 person teams affectionately known as ‘Pod Squads’. At survey we will advise the installation period and will liaise with you shortly after order to agree a suitable installation date.

Recent Posts

A modern pergola shelters a dining table and chairs, surrounded by lush, colorful garden plants, with a wooden building to the right and dense greenery in the background.

How to Prepare Your Garden for Pergola Installation

A pergola is a fantastic addition to a garden, creating a beautiful and flexible space that will delight all year round. If you’re planning to have a pergola installed this year, there are a few steps you need to take before…

Read More